Changelog
2.8
Released on October 7, 2026
New features
- Inclusive end dates: end dates are shown as the last day of a task
- Secondary grid panel to the right of the chart | PRO feature
- Auto scheduling
- Faster auto scheduling and bulk updates | PRO feature
- Scheduling with all 4 link types | PRO feature
- Constraints | PRO feature
- Scheduling conflicts reporting UI | PRO feature
- Deadlines | PRO feature
- Inactive tasks | PRO feature
- Manually scheduled tasks | PRO feature
- Timeline
- Progress line | PRO feature
- S-curve | PRO feature
- Data operations
- Resources
- Histogram mode of the Resource load chart | PRO feature
- Assigning resources by dragging them from the Resource load chart | PRO feature
- Scheduling tasks by resource calendars | PRO feature
- Export of resources and assignments | PRO feature
- Support of multi-user editing (real-time updates)
Updates
- Simplified model of unscheduled tasks: removing the start date unschedules the task | PRO feature
- Scheduling unscheduled tasks by drag-n-drop in the chart area | PRO feature
- Preventing invalid links in the UI | PRO feature
Fixes
- Gantt fails to load projects with long task chains
- Incorrect header height of collapsed grid
- Filtering does not work for grouped tasks
- Task updates incorrectly set
unscheduledfor summary tasks - Drag-n-drop between groups based on duration incorrectly changes
duration - On load performance with state derivation and dates
- Undo/redo with auto scheduling doesn't snap to dates correctly
- Deleting branches with subtasks throws errors
- A single edit is recorded as several undo steps
- Summary task dates are stale after lazy load into a branch
- Undo does not remove fields added by an edit
- MS Project export ignores the
durationUnitsetting and treats hour durations as days - Link lag is lost during export to and import from MS Project
- A task without its own dates takes them from its baseline on import from MS Project
- Import from MS Project treats a single baseline with any number as the primary one
- Task fields are exported to MS Project out of the MSPDI schema order
- Trim inner fields and duplicated data from the export payload
- Copying a task ignores link lag
- Clearing link lag does not reschedule tasks
- Split task segments are sometimes incorrect
- Undo after auto-scheduling moves tasks that weren't part of the change
- Provider debounce drops earlier partial task updates
- Silent summary updates do not go to the server
- Task update sends old dates after auto-scheduling
- Assignments removed on a change to summary do not go to the server
- Summary tasks are saved in the middle of task dragging
- Stale state after executing "import-tasks" or prop changes
Breaking changes
See the Migration guide for the 2.7 → 2.8 changes.
2.7.4
Released on September 9, 2026
Fixes
- Grid and chart rows get out of sync after indent / outdent operations
2.7.3
Released on September 1, 2026
Fixes
- Setting link lag breaks task dates
- Editor allows negative values for split tasks segments
- Undoing "delete-task" action does not restore assignments for this task
- The "copy-task" action does not copy task assignments
- The
readonlysettings do not block grid inline editors - Initial auto scheduling pass is added to history and can be undone
- Clipboard keeps ids of deleted tasks
- Tasks after undo / redo with enabled autoscheduling don't snap to dates correctly
- History is not reset when links, resources or assignments are replaced
- History handlers are active after disabling undo / redo at run time
- Undo / redo replay triggers auto scheduling
- Context menu references the previous task
- Copy and paste of parent branches duplicates child tasks
- Grid cell padding is misaligned
- Fonts cannot be fully switched off from theme settings
2.7.2
Released on June 29, 2026
Fixes
- Toolbar and context menu fail to render when no locale is provided
2.7.1
Released on June 26, 2026
Fixes
- Better performance with links rendering
- Zoom cannot start from Resource load view
- Auto scheduling and summary
autoProgresstrigger infinite loop - Focus on Grid header and body cells is lost / unstable
- Undo of the "move-task" action doesn't work after task was moved to a different branch
- Cell width gets a fractional value when scale start/end are set
- Newly added task is not rendered correctly after update
highlightTimecan be used only with day / hour minimal scale unit- Incorrect marker position when zooming out to year scale
2.7
Released on June 4, 2026
New features
- Resource management | PRO feature
- Visualizing and assigning resources | PRO feature
- Resource load chart | PRO feature
- Resource assignment handling in the Go backend | PRO feature
- Grouping tasks by resources | PRO feature
- Individual calendars for resources | PRO feature
- Individual calendars for tasks | PRO feature
- Grouping tasks by any field | PRO feature
- WBS codes | PRO feature
- Enhanced Editor UI with tabs for details
- Tooltips for links
Updates
- Calendar JSON definition for serialization | PRO feature
- Dynamic rendering of the timescale
- Enhanced Tooltip with detailed settings
- Sticky text in scale cells to ensure that it is always visible
- Improved auto scheduling with summary tasks | PRO feature
Fixes
- Export of tasks with calendar shows incorrect dates
- Zooming and scrolling in long scales is too slow and crashes
- Tree markers are lost after clearing filters
- Excessive
render-datacalls on horizontal scrolling - Hover area for links is too small
Breaking changes
- Calendar is defined not via explicit instance creation, but by plain config
- Tooltip content receives
{ api, data }instead of{ task, segmentIndex }
2.6.1
Released on March 27, 2026
Fixes
- Incorrect license info
- Error in MIT package
2.6
Released on March 18, 2026
Initial features
Provides all the same functionality as Svelte Gantt 2.6.1